◆ Platform · Customer Portal

Customer portal: clients see their jobs in real time

No more calling to ask what happened on site.

7 Days

Battery Life

IP65

Dust / Water

BLE 5.3

Connectivity

Live job status

Clients see the same stage timeline dispatch and crews see — no phone calls to check in.

Technician ETA

Real-time ETA updates the moment a crew's route or schedule changes.

Before/after photos

Every job closes with visual proof, viewable the moment it's uploaded.

Digital reports & sign-off history

Every signed FSR and report lives in one place, searchable by site.

§06

One project, many views

Shaped for every role on the job

Same underlying record — leadership, dispatch, field crews, and customers each get the slice that matters to them.

01

Owner / Executive

Leadership
MO

Sunridge Solar Array

M. Ortega

$18,400 · 4.2 MWCleared
KR

Desert Bloom HVAC Contract

K. Reyes

$6,200 · Renewal in 9 daysAt risk
TN

Copperline Logistics Route 12

T. Nwosu

$2,100 · Awaiting partsBlocked
SM

Palo Verde Hotel Turnover

S. Malik

$980 · 32 roomsCleared

Crew utilization is up 12% this month; 3 jobs are overdue across the Phoenix territory.

02

Operations Coordinator

Dispatch / Ops
SS

Crew A — J. Alvarez

Sunridge Solar Array

Reached Site · 8:42 AMScheduled
MH

Crew B — D. Whitfield

Meridian HVAC Retrofit

Work Started · running 40 min lateAt risk
R1

Crew C — R. Castillo

Route 12 — Last Mile

Completed · 9:58 AMCleared
CR

Crew D — unassigned

Canyon Ridge Landscaping

Needs assignment by 2:00 PMBlocked

2 crews are within 15 minutes of their next stop; 1 job is unassigned for tomorrow.

03

Technician

Field Technician
M+

Canyon Ridge Landscaping — Zone 3

Mowing + irrigation check

Annotation: Sprinkler head needs replacementAt risk
F+

Meridian HVAC Retrofit

Filter + coil service

ETA 1:30 PMScheduled
DC

Palo Verde Hotel — Floor 3

Deep clean turnover

FSR signed · 11:02 AMCleared

3 jobs remaining today; Canyon Ridge FSR is drafted and waiting on your on-site signature.

04

Client / Site Owner

Customer
ND

Route 12 — Last Mile

Next delivery window: Sep 18, 9:00 AM

Assigned: Crew CScheduled
SB

Q3 Delivery Summary

Signed by T. Nwosu

Aug 29 · PDF + photosCleared
PR

Route Exception Follow-up

Pending reschedule

ETA Sep 22At risk

Your next visit is tomorrow at 9:00 AM. Last service report was signed 6 days ago.

Book a call

Ready to see your crews on one live record?

20 minutes, on a job that looks like yours.

Book a call